Saltar al contenido
Contact
News
Language
English
Deutsch
español
Internal
Internal
Bienvenido
Productos
Instalaciones fotovoltaícas
FV & Almacenamiento
Tejado solar
FV sobre suelo
Alumbrado público
Invernaderos
Telecomunicación
Hydroenergía
Tratamiento de aguas
Energía pórtatil
Energía aislada
Bombeo agua solar
E-Movilidad
Estructura FV de cuerda
Calentamiento - paneles
Cabina de Desinfección Móvil
Servicios
Consultoría energética
Comunicación
Servicios industriales
Domiciliación
Inversión
Autoconsumo
Inversión
Empresa
Sobre nosotros
Patrocinio
Oportunidades profesionales
Referencias
A Gran escala
Comercial
Público
Residencial
Noticias
Todo
Este sitio web
International
Botswana
Canada
Caribbean
Fiji
France
Germany
Greece
Guyana
India
Italy
Kenya
Mauritius
Pakistan
Saudi Arabia
Spain
Switzerland
United Kingdom
USA
Zimbabwe
Boletín informativo
Medios de comunicación
10/10/17: REMOTE COMMUNITY IN GUYANA TO BE POWERED BY SOLAR ENERGY
meeco AND oursun Guyana WILL INSTALL 400 kWp OFF-GRID sun2live SOLUTION TO PROVIDE MABARUMA REGION WITH CLEAN ENERGY
The Government of the Co-operative Republic of Guyana aims to foster the transition towards a 100% renewable energy supply by 2025. As part of this strategy, the Hinterland Electrification Company Inc. (HECI), associated with the Ministry of Public Infrastructure, strives to improve the electricity situation of remote areas and reduce their dependence on cost-expensive and polluting diesel generators. The Mabaruma region will now benefit from this approach, since the HECI has awarded meeco the tender to design, supply and install a 400 kWp solar system for the community, which meeco will execute together with its local joint venture oursun Guyana.
READ THE FULL ARTICLE ON OUR BLOG
Mabaruma-Solar-Project.pdf
The HECI has awarded meeco the tender to design, supply and install a 400 kWp solar system for the Mabaruma region.
remote-solar-project.jpg
For isolated off-grid regions such as Mabaruma, solar energy represents a cost-effective alternative source of power.
solar-project-Mabaruma.jpg
Due to the remote location of the site, meeco will have to overcome some logistical challenges and, for example, choose smaller containers and boats.
Mabaruma.jpg
How can we help?